Image

The real-time LiDAR gauge for OLE Surveying

Generate automatic reports right after your field campaign:

- Excel sheet for workbook.

- CAD drawings of cross sections.

- Rectified 3D pointcloud.

 

 

 

Download for free an example of real automatic reports generated by tCat

The reports were generated on a 1435 mm line, with flexible and rigid catenary systems, over a 1500 metres section.